OpsProof
FlowTwin baseline ready

Advanced model tools use the same validated decision state.

Reviewed operation / editable

What will keep the operation safe?

Test tomorrow's conditions and find the lowest-cost qualifying capacity change.

Proof or refusal

Judge Challenge

The main demo: promotion demand rises 40% while one packing station is unavailable for 20 minutes.

All reviewed scenarios

Service target: 90% / 20 min per case. Qualification: ≥90 of 100 fixed-seed recovery runs.

Adjust scenariocompound

Reviewed default: Packing is unavailable for 20 minutes during the demand spike.

Reviewed sample values are ready.

Ready for analysisSeed 20260713

Decision preview

Risk, bottleneck, and the lowest-cost qualifying recovery will appear here.

No API key is required. Every number comes from the deterministic FlowTwin engine.

Evidence & audit trailMetrics · assumptions · seeds · replay · export

Run artifacts

Run the decision analysis to generate evidence.

Advanced model toolsGraph · provenance · JSON

Confirmed input / editable

Review the process model

Check how work moves through the operation. You can adjust available people or equipment, or continue directly to the stress test.

Project tools

Optional browser storage and sample controls.

Model valid. Changes are checked before FlowTwin can run them.Seed: 20260713

How work moves

Process overview

6 nodes · 6 edges

Routing check: Quality result routes total 100%.

Input confidence

Where the model values came from

Every value is tagged as explicit source evidence, inferred, defaulted, or confirmed by you. The full audit trail is available when you need it.

View source evidence and assumptions (5)
  • From source evidence

    /horizonMinutesThe fulfillment operation runs for 8 hours (480 minutes).

  • From source evidence

    /nodes/0/arrival/ratePerHourThe normal average arrival rate is 12 orders per hour.

  • From source evidence

    /resourcePools/0/capacityThree pickers share one common work queue.

  • From source evidence

    /resourcePools/2/capacityOne packing station serves all approved orders.

  • From source evidence

    /slas/0At least 90% of completed orders should finish within 20 minutes of arrival.

Advanced model data

For technical review or import/export. Invalid data is rejected before FlowTwin can run it.